Municipal teams from the Public Works Directorate continued repair, maintenance and reinstatement works in areas where infrastructure projects have been completed. We also carried out asphalt patch repairs on streets and roads that were damaged as a result of infrastructure works undertaken by other institutions.
During June, we completed interlocking paving works on Akyarlar Liman Caddesi, a concrete road on Akçabük Caddesi, a paved pavement on Koyunbaba Mahallesi Denizyıldızı Sokak, and interlocking paved roads on İslamhaneleri Mahallesi 5257 Sokak and Bahçelievler Mahallesi 7248 Sokak. We finalised the concrete pedestrian walkway and associated landscaping around Yalıkavak İskele Meydanı, completed interlocking paving works on Baysal Sokak, delivered a concrete road on Dirmil Mahallesi 6787 Sokak, and completed pavement and concrete road construction on Geriş Mahallesi 6462 Sokak. We also carried out kerbstone installation on Türkbükü Mahallesi Liman Caddesi, delivered an interlocking paved road on 157 Sokak, completed interlocking paving on Gölköy Mahallesi Atatürk Caddesi, and implemented concrete road works on Gündoğan Mahallesi 539 Sokak. In addition, we opened a cadastral road on Karaova Mahallesi 8193 Sokak, carried out unpaved road grading in Alhan Mevkii, delivered a concrete road in Bahçeyaka Mahallesi Çeşmederesi Mevkii, and constructed stairs and an accessible ramp on Eskiçeşme Mahallesi 1522 Sokak.
Following works by AYDEM (the regional electricity distribution company), we carried out road maintenance and cleaning on Fırkateyn Sokak. After works by MUSKİ (Muğla Metropolitan Municipality Water and Sewerage Administration), we completed the asphalt road and pavement works on Bitez Bergamut Caddesi. We also constructed a stone retaining wall on Konacık Adalı Sokak.