The Directorate of Civil Works teams continue their efforts to clean rainwater drainage lines, open canals and maintain stormwater drains across the peninsula.
Starting on July 25th, the ongoing work involves clearing debris that obstructs the flow of water through rainwater drainage lines and stormwater drains, followed by a high-pressure water wash. These efforts aim to ensure the proper functioning of the drainage systems and prevent potential flooding during heavy rainfall.
So far, the municipal teams have conducted maintenance work on culverts, stormwater drains, and rainwater drainage lines in Umurça Neighborhood, Kumbahçe Neighborhood, Eskiçeşme Neighborhood, Yokuşbaşı Neighborhood, Türkkuyusu Neighborhood and Çarşı Neighborhood.